The University of Saskatchewan
The University of Saskatchewan’s Health Sciences E Wing was constructed as an extension to an existing building on campus.
Read MoreThe University of Saskatchewan’s Health Sciences E Wing was constructed as an extension to an existing building on campus.
Read MoreThe Nevada State Public Works Board contracted Automated Temperature Controls to install Kaizen from CopperTree Analytics in the government’s 130,000 ft2 State Library and Archives building in Carson City, Nevada.
Read MoreThe Canberra Airport Terminal is renowned for its sustainability and energy efficiency initiatives, winning multiple awards for its leading-edge approach to building design and operation.
Read MoreA Canadian Airport set out with the goal to prioritize maintenance operations and gauge the performance of the sub-contractors.
Read MoreSouth Florida Controls used CopperTree Analytics to study the building and identify which equipment, systems and structures could have the most energy-saving impact.
Read MoreSince prioritizing energy efficiency, energy consumption of the facility has been reduced by 20% while maintaining occupant (patients and visitors) comfort and indoor air quality.
Read MoreIn searching for potential load shedding opportunities, the Energy Manager of the Delta School District wanted to implement a program to stagger the start of the Air Sourced Heat Pumps (ASHP). Doing so would minimize the demand charges triggered by their concurrent start
Read MoreIn December 2015, construction of the new Bega Hospital was completed. The facility, located 1.5 km from the city centre, was built to enhance the existing health service offerings to South East New South Wales (NSW).
Read MoreSpecializing in testing, inspection, certification and verification services, this company serves multiple industries worldwide and provides analytical geochemistry services to the global mining industry.
Read More